Wednesday 15 March 2017

SR: Production Schedule: UPDATE 9

This is the 9th update of the production schedule, which I created. It includes the tasks that we have completed so far, and the ones which are still to be completed. I always like to use color coding since it gives me a great overview of what still needs to be done. 
After last time it has changed quite a bit. First of all we have changed the name of our rough cut 1 draft 1, draft 2, draft 3 etc. to seperate rough cuts, now being called rough cut 1, rough cut 2 etc. 

Secondly, we need to film more narrative footage still, so we have put that into the production schedule as well for Thursday the 16th of March. Due to this the date of the final cut (17 March) might now be 21st of March instead. 

Besides that rough cut 10, 11 and 12 were completed on time. 

No comments:

Post a Comment

All comments are moderated and reviewed by the blog owner before publication.